Risk management

How organisations identify, assess, control and monitor the risks to their objectives, explained with Australian examples and the relevant APRA and ASIC requirements.

Beginner to Advanced 31 topics Last reviewed: 27 September 2026 Checked against sources
Explainer · 1 min 22 s · Narrated, with captions What is risk management? Risk as the effect of uncertainty on objectives, the risk management loop, and the ways to respond to a risk. Download (MP4, 2.4 MB) Read the page: What is risk management?
Transcript and description

A voice reads the captions aloud. This lists what appears on screen and the captions, in order.

  1. On screen: Title card: What is risk management? The loop every risk process follows.
  2. On screen: A statement appears: Risk is the effect of uncertainty on objectives. The international guideline ISO 31000 describes risk as the effect of uncertainty on objectives. No objective, no risk.
  3. On screen: Three cards compare a risk, an issue and an incident, each with a payment system example. A risk might happen. An issue is a problem that exists now. An incident is something that has already happened.
  4. On screen: A cycle of six steps appears one by one: set the context, identify, analyse, evaluate, treat, monitor and review. In the centre: communicate, consult and record at every step. Most frameworks follow a loop. First, set the context: the objective, the scope and the criteria for judging risks. Then identify what could happen, analyse how likely and how severe it is, and evaluate whether it is acceptable. Treat the risks that aren't acceptable. Then monitor and review, because risks and controls change. Identifying, analysing and evaluating together are called risk assessment. Communication runs through every step.
  5. On screen: Five cards show the responses: avoid, reduce, share, accept and pursue. There are only a few ways to respond: avoid, reduce, share or accept a risk, or pursue an opportunity. Most real cases use a mix.
  6. On screen: A statement: the aim isn't zero risk, it's taking the right risks knowingly. Every organisation takes risks to achieve anything. Risk management makes those choices deliberate, and keeps the rest at a level it can live with.
  7. On screen: A statement about the APRA requirement for a risk management framework under CPS 220 and SPS 220. For regulated financial institutions, risk management isn't optional. It is a legal requirement overseen by APRA.
  8. On screen: End card with the page title, web address and a general information disclaimer.

New to risk management?

Start with the What is risk management? primer, then follow the learning path below. Terms are defined in the Glossary.

Learning path

The topics build on each other. Steps 1–4 are the core toolkit; steps 5–9 apply it to specific types of risk and events.

  1. Set the boundaries: risk appetite and tolerance

    How much risk the board is prepared to take, and how that becomes measurable limits.

  2. Assess the risks

    Likelihood × consequence, qualitative and quantitative methods, heat maps and their limits.

  3. Control the risks

    How to design controls that work, and how to test that they do.

  4. Join it up: enterprise risk management

    Managing risk across the whole organisation, linked to strategy and culture.

  5. Operational risk

    People, process, systems and external events, and APRA's CPS 230.

  6. Credit, market and liquidity risk

    The core financial risks, in plain English.

  7. Incidents and breaches

    What to do when something goes wrong, and when regulators must be told.

  8. Business continuity

    Keeping critical operations running through severe disruption.

  9. Third-party and outsourcing risk

    Managing the risks of relying on service providers.

All topics

Risk appetite and tolerance

Risk capacity, appetite, tolerance and limits; what goes in a risk appetite statement; monitoring and escalation.

Intermediate

Risk assessment methodologies

Likelihood × consequence, qualitative vs quantitative, and an interactive heat map.

Intermediate

Control design and testing

Types of controls, what makes a control well designed, and how controls are tested.

Intermediate

Enterprise risk management (ERM)

Risk frameworks, risk culture, taxonomies and the evidence on whether ERM adds value.

Intermediate

Operational risk

What operational risk covers, loss event types, and the key requirements of CPS 230.

Intermediate

Credit, market and liquidity risk

The basics of the main financial risks and how APRA regulates them.

Beginner

Incident and breach management

From first report to root cause: assessing, reporting and remediating incidents and breaches.

Intermediate

Business continuity

Critical operations, tolerance levels, business impact analysis and testing.

Intermediate

Third-party, vendor and outsourcing risk

The service provider lifecycle, material service providers and CPS 230 requirements.

Intermediate

Climate risk management

Physical and transition risk, how they flow into financial risks, scenario analysis and APRA's CPG 229.

Intermediate

Cyber risk management

Threats, the Essential Eight, incident response and cyber regulation.

Intermediate

Model risk management

Model inventories, tiering, validation and effective challenge, including AI models.

Intermediate

Fraud risk management

Internal and external fraud, the fraud triangle, detection analytics and the scams interface.

Intermediate

Assurance mapping and combined assurance

Who checks what: mapping assurance across the three lines to find gaps and duplication.

Intermediate

Issue and action management

Raising, rating, tracking and validating fixes to control weaknesses.

Intermediate

Change, project and reputational risk

Managing risk through change, keeping projects honest, and protecting trust.

Intermediate

Advanced topics

Deeper, more technical material for experienced practitioners. Each assumes you know the core topics above.

Quantitative operational risk

Loss frequency and severity, heavy tails, VaR and expected shortfall, with a Monte Carlo simulator.

Advanced

Scenario analysis and stress testing

Severe but plausible scenarios, reverse stress testing, and what CPS 230, CPS 190, the ICAAP and SPS 530 require.

Advanced

Setting CPS 230 tolerance levels

A step-by-step method, super fund and bank examples, and an interactive tolerance builder.

Advanced

Risk aggregation and correlation

Building the enterprise risk profile: roll-up rules, correlation and diversification, concentration and interdependency.

Advanced

Control testing: sampling and assurance

Attribute sampling, confidence and tolerable deviation rates, evaluating exceptions and evidence standards, with calculators.

Advanced

Root cause analysis

5 whys, fishbone, barrier analysis, bow-tie and fault trees, with a fault tree calculator.

Advanced

KRI design and statistical thresholds

Choosing indicators with real signal, setting thresholds and testing them, with a control chart.

Advanced

Human factors and cognitive bias

The biases that distort risk ratings and escalation, and how to counter them, with a calibration test.

Advanced

Mapping critical operations end to end

A practical method for CPS 230 process and resource mapping, with a dependency explorer.

Advanced

Provider concentration, fourth parties and exit

Substitutability, planned versus stressed exit and credible exit plans, with a scorer.

Advanced

Liquidity stress testing for super funds

Switching, hedging, unlisted assets and the denominator effect, with a stress simulator.

Advanced

Theories of risk

Risk perception, social amplification, normal accidents, high reliability and systems approaches.

Advanced

Does ERM work? The evidence

What research shows about enterprise risk management, value and crisis performance.

Advanced

The economics of cyber risk

Incentives, how much to invest, heavy-tailed losses and cyber insurance.

Advanced

Climate risk: the research

Whether markets price climate risk, network contagion and investor responses.

Advanced

Last reviewed: 27 September 2026 · Next review due: September 2027

Spotted an error or an out-of-date requirement? Suggest a correction (free GitHub account needed). See how we check content.