Control design and testing
A control is only worth having if it targets the right risk, is performed consistently, and can be shown to work. This page covers how to design controls well and how to test them.
Put it into practice: Playbook: Test a key control
Transcript and description
A voice reads the captions aloud. This lists what appears on screen and the captions, in order.
- On screen: Title card: Controls, design, operation and testing.
- On screen: Three cards: preventive, detective and corrective controls with examples. A control is anything that keeps a risk within appetite. Controls can prevent, detect or correct problems.
- On screen: Two cards compare design effectiveness and operating effectiveness. Testing asks two separate questions. First: is the control well designed? Would it work if performed as described? Second: did it actually operate, consistently, over the whole period? A well-designed control that isn't performed does nothing.
- On screen: A bar chart ranks test methods from inquiry, the weakest, to reperformance, the strongest. Not all evidence is equal. Asking someone is weakest; inspecting records or reperforming the control is much stronger.
- On screen: A flow from test to exception, root cause, and action with validation. Every exception needs a root cause and an action. The issue is closed only when someone independent confirms the fix works.
- On screen: End card with the page title, web address and a general information disclaimer.
Types of control
| Type | What it does | Examples |
|---|---|---|
| Preventive | Stops the problem happening. | System blocks a payment over an approval limit; segregation of duties; mandatory fields on a form; access restrictions. |
| Detective | Finds the problem after it happens, so it can be fixed quickly. | Daily reconciliations; exception reports; quality assurance sampling; review of access logs. |
| Corrective | Limits the damage and restores normal operations. | Backup and restore; incident response plans; customer remediation processes. |
| Directive | Tells people what to do. | Policies, procedures, training, codes of conduct. Necessary but weak on their own. |
Controls also differ by how they are performed:
- Automated controls are performed by a system. Once working, they operate consistently, but they depend on general IT controls (such as change management and access security) remaining effective.
- Manual controls are performed by people. They are flexible but more prone to error, fatigue and being skipped under pressure.
- IT-dependent manual controls combine the two: for example, a person reviews a system-generated exception report. The control is only as good as the report's completeness and accuracy.
A key control is one that, alone or with a few others, is essential to keeping a significant risk within appetite. Key controls get the most testing attention.
Seeing controls with a bow-tie
Bow-tie analysis is a simple way to check whether you have the right controls in the right places.
Anatomy of a well-designed control
A control description should let someone who has never seen the process understand exactly what happens, and let a tester check it. A useful checklist is who, what, when, how, evidence and exceptions.
| Element | Weak description | Strong description |
|---|---|---|
| Who | "Operations" | "The Contributions Team Leader (or delegate when on leave)" |
| What | "Reviews contributions" | "Reconciles total contributions received in the bank account against total contributions allocated to member accounts" |
| When | "Regularly" | "Each business day by 11 am for the previous day's receipts" |
| How / precision | "Checks for issues" | "Investigates any difference over $100 or any item unallocated for more than 2 business days" |
| Evidence | (none) | "Signs off the reconciliation in the workflow system, attaching the variance report" |
| Exceptions | (none) | "Unresolved differences over $10,000 or older than 5 days are escalated to the Head of Operations and logged as an incident" |
Assessing design effectiveness
Before testing whether a control operates, ask whether it could work if performed perfectly. Try the checklist.
Testing controls
Control testing checks whether controls are designed and operating effectively. Under APRA's CPS 230, regulated entities must regularly monitor, review and test their controls for design and operating effectiveness, with frequency matched to the materiality of the risks; report results to senior management; and rectify gaps in a timely way.
The testing process
- Plan
Pick controls to test based on risk (key controls first), define the test objective, the period covered and the population.
- Understand and walk through
Confirm how the control really works by following one transaction end to end. This tests design and often reveals that practice differs from the procedure.
- Test operating effectiveness
Select a sample (or the whole population using data analytics) and check evidence that the control operated correctly each time.
- Evaluate exceptions
For every failure: was it a one-off or systemic? What was the root cause? Did it cause harm (a possible incident or breach)?
- Rate and report
Conclude on effectiveness, agree actions with owners, report to management and track actions to closure.
Testing methods
| Method | What it involves | Strength of evidence |
|---|---|---|
| Inquiry | Asking the control owner how the control works. | Weakest. Never enough on its own. |
| Observation | Watching the control being performed. | Shows it happens at that moment only. |
| Inspection | Examining evidence (sign-offs, reports, system logs) for a sample of occurrences. | Good, if the evidence is reliable. |
| Re-performance | Independently performing the control again and comparing results. | Strong. |
| Data analytics | Testing 100% of transactions with data tools, for example checking every payment against approval limits. | Strong and complete, if data is complete and accurate. |
How many to test?
Sample sizes usually depend on how often the control runs and how much reliance is placed on it. The table below is an illustrative example of a sampling guide; organisations and audit firms set their own methodologies, and statistical sampling may be used for large populations.
| Control frequency | Example sample size for a test period of a year |
|---|---|
| Annual | 1 |
| Quarterly | 2 |
| Monthly | 2–5 |
| Weekly | 5–15 |
| Daily | 20–40 |
| Many times a day | 25–60 |
| Automated | Often 1 per configuration, plus testing the general IT controls that keep it stable |
Rating the result
| Rating | Typical meaning |
|---|---|
| Effective | Well designed and operated as intended throughout the period, with no (or only trivial, explained) exceptions. |
| Partially effective | Some design gaps or exceptions; the risk is still largely managed but improvement is needed. |
| Ineffective | Significant design flaw or repeated failure; the control cannot be relied on and residual risk should be re-assessed. |
From test failure to incident
A failed control test can reveal that harm has already happened, for example payments made without approval. That makes it a potential incident or breach, which needs to be assessed under the incident and breach process, not just recorded as a testing finding. CPS 230 also requires identified control gaps and weaknesses to be included in the entity's operational risk profile until they are fixed.
Who tests?
- First line control owners and business quality teams perform control self-assessment and quality checks.
- Second line risk and compliance teams run independent monitoring and testing programs, and challenge first-line results.
- Third line internal audit tests controls as part of its independent assurance, and may rely on others' work if it has checked its quality.
- External assurance, for example reports on controls at service organisations prepared under the Australian standard ASAE 3402 (and, for investment services such as custody and administration, guidance statement GS 007). These help organisations get comfort over controls run by service providers.
Coordinating these (sometimes called "combined assurance" or assurance mapping) avoids both gaps and duplicated testing.
Check your understanding
Worked example: testing a daily reconciliation
This is an illustrative example for learning only.
| Step | What the tester does (illustrative) |
|---|---|
| Understand | Reads the control description: the Contributions Team Leader reconciles bank receipts to allocations each business day by 11 am, investigates differences over $100 and escalates unresolved items. |
| Test design | Walks through one day's reconciliation with the performer. Checks the report is complete (all bank accounts) and the $100 threshold suits the risk. Design: effective. |
| Pick a sample | About 250 business days in the year; picks 25 at random, plus 2 days around a system change. |
| Test operation | For each day: was the reconciliation done on time, signed off, were differences over $100 investigated, were items over 5 days escalated? |
| Evaluate | One late sign-off (2 pm) with no harm, and one unescalated item 7 days old. The second is a deviation that matters. |
| Conclude and act | Operating effectiveness: partly effective. Issue raised: escalation step not reliably performed; action to add an automated age alert, then retest. |
Common mistakes
- Controls described as activities ("reviews reports") with no precision, threshold or evidence.
- Testing only that a signature exists, not that the review actually caught what it should.
- Relying on system reports without checking they are complete and accurate.
- Treating training and policies as strong controls. They direct behaviour but rarely stop or catch errors on their own.
- Tests that never fail, which may mean the testing isn't looking hard enough.
Questions a board can ask
These are prompts for discussion, not requirements.
- Which key controls protect our most important risks, and when were they last tested?
- What proportion of tested controls were effective, and what changed as a result of the failures?
- How much do we rely on manual controls in high-volume processes?
Frequently asked questions
Who should test controls?
All three lines can, for different purposes: the first line checks its own controls, the second line tests independently for risk and compliance, and internal audit gives independent assurance. See Assurance mapping.
How many items should be tested?
It depends on how often the control runs and how much assurance is needed. See Control testing: sampling for the method.
Sources
- Australian Prudential Regulation Authority, Prudential Standard CPS 230 Operational Risk Management (controls requirements, in force from 1 July 2025).
- Committee of Sponsoring Organizations of the Treadway Commission, Internal Control – Integrated Framework (2013).
- Auditing and Assurance Standards Board, ASAE 3402 Assurance Reports on Controls at a Service Organisation, and GS 007 Audit Implications of the Use of Service Organisations for Investment Management Services.
- The Institute of Internal Auditors, Global Internal Audit Standards.
Last reviewed: 7 October 2026 · Next review due: October 2027
Spotted an error or an out-of-date requirement? Suggest a correction (free GitHub account needed). See how we check content.