Enterprise risk management (ERM)

ERM means managing all of an organisation's risks together, as one portfolio, linked to its strategy, rather than in separate silos.

Intermediate About 20 minutes Last reviewed: 9 October 2026 Checked against sources

From silos to an enterprise view

Traditionally, risks were managed where they arose: the finance team handled financial risks, IT handled technology risk, legal handled legal risk, and each kept its own list. That works until risks interact. A cyber attack is an IT problem, but also an operational, legal, regulatory, reputational and member-harm problem at the same time.

ERM adds an organisation-wide layer on top. It doesn't replace specialist risk management; it connects it.

Siloed risk management versus ERM On the left, siloed risk management: four separate boxes for finance, IT, legal and operations, each with its own risk list and its own report, with no connections. On the right, ERM: the same four areas use a common taxonomy and method and feed into a single enterprise risk profile, which is compared with risk appetite and reported to the board and used in strategy. Siloed Enterprise (ERM) Financeown list, own scale ITown list, own scale Legalown list, own scale Operationsown list, own scale No common language, no total picture, connections between risks missed Finance IT Legal Operations Common taxonomy, rating scales and method Enterprise risk profile aggregated, connected, vs appetite Board and strategy decisions informed by risk
ERM connects specialist risk management into one enterprise view.
FeatureTraditional (siloed)ERM
ScopeIndividual risk types, managed separatelyAll material risks, as a portfolio
FocusAvoiding lossesAchieving objectives; downside and upside
Link to strategyConsidered after strategy is setConsidered when strategy is set
OwnershipSpecialist functionsEveryone, with clear roles (see Three Lines)
ReportingSeparate reports by risk typeIntegrated risk profile against appetite

The parts of a risk management framework

APRA's Prudential Standard CPS 220 (for banks and insurers) and SPS 220 (for super trustees) set out what an enterprise-wide risk management framework must include. In summary, the framework must cover all material risks and includes:

Boards of banks and insurers (under CPS 220) and super trustees (under SPS 220) must also make an annual risk management declaration to APRA about the framework. APRA's CPG 220 gives guidance on its expectations. The requirements are principles-based, so the size and complexity of the framework should fit the organisation.

Risk taxonomy: a common language

A risk taxonomy is a structured list of risk categories that everyone in the organisation uses. Without one, the same risk gets called different things in different places and can't be added up. A simplified example:

Example risk taxonomy A tree. At the top: enterprise risk. Level 1 categories: strategic risk, financial risk, insurance risk and operational risk. Under strategic: business model, competition, reputation. Under financial: credit, market and investment, liquidity. Under insurance: underwriting, claims, reserving. Under operational: process and people, technology and cyber, third party, legal, compliance and conduct. Enterprise risk Strategic Financial Insurance Operational Business modelCompetitionReputation CreditMarket and investmentLiquidity UnderwritingClaimsReserving Process and peopleTechnology and cyberThird partyLegal and complianceConduct Illustrative. Some organisations treat climate or reputation as cross-cutting drivers rather than categories.
Taxonomies usually have two or three levels. Level 1 categories often line up with the entity's material risks.

Seeing the whole: aggregation and connections

The most valuable thing ERM adds is the ability to see things the silos can't:

Risk culture

Risk culture is how people in the organisation actually think about and behave towards risk: whether they speak up, whether bad news reaches the top, whether rules are followed when nobody is watching, and whether risk is part of everyday decisions.

APRA's CPS 220 requires the board to form a view of the entity's risk culture, and the extent to which it supports operating within risk appetite, and to identify and address any changes needed. APRA's 2018 Prudential Inquiry into the Commonwealth Bank found that the bank's continued financial success had "dulled the senses of the institution", contributing to complacency and a reactive approach to non-financial risks, and put culture and accountability at the centre of its 35 recommendations.

Signs of a healthy risk culture

ERM maturity

Organisations often describe their ERM journey in stages. A simple, illustrative model:

StageWhat it looks like
1. InitialRisk managed ad hoc, in silos, mostly after problems occur.
2. DevelopingA framework and risk register exist; compliance-driven; limited link to decisions.
3. DefinedCommon taxonomy and method; risk appetite with metrics; regular reporting to the board.
4. IntegratedRisk considered in strategy, planning, investment and product decisions; good data and aggregation.
5. OptimisedRisk-informed culture; forward-looking scenario analysis; continuous improvement.

Does ERM work? What the research says Advanced

ERM has been studied for about two decades. The evidence is mixed and should be read carefully:

The practical lesson: ERM adds value when it genuinely changes decisions and behaviour, and adds little when it is mainly documentation.

What CPS 220 and SPS 220 expect of the framework (summary)

For APRA-regulated entities, ERM is largely set by CPS 220 (banks and insurers) and SPS 220 (super trustees). See CPS 220 for the detail.

ElementIn brief
Risk management strategyHow the institution manages its material risks, approved by the board.
Risk appetite statementThe degree of risk the board is prepared to accept, with tolerances for material risks.
Business planHow strategy is delivered, linked to risk.
Policies and proceduresCovering each material risk.
Risk management functionOperationally independent of the business, headed by a chief risk officer, with a designated compliance function.
ReviewRegular review, and a comprehensive, operationally independent review at least every three years.
Risk management declarationBanks, insurers and super trustees give APRA an annual board risk management declaration.

Common mistakes

Questions a board can ask

These are prompts for discussion, not requirements.

  1. How does risk information change our strategic decisions?
  2. What are our top emerging risks, and who is watching them?
  3. When was our framework last independently reviewed, and what did it find?

Frequently asked questions

Do we need ISO 31000 or COSO?

Neither is legally required. Both are frameworks organisations use to structure ERM. APRA-regulated entities must meet CPS 220 or SPS 220 whichever framework they use. See Core frameworks compared.

Who owns ERM?

The board is ultimately responsible; management runs it; the risk function designs the framework and challenges the business; internal audit provides independent assurance.

Sources

  1. Australian Prudential Regulation Authority, Prudential Standard CPS 220 Risk Management, SPS 220 Risk Management and CPG 220 Risk Management.
  2. Australian Prudential Regulation Authority, Prudential Practice Guide CPG 229 Climate Change Financial Risks.
  3. Australian Prudential Regulation Authority, Prudential Inquiry into the Commonwealth Bank of Australia: Final Report (May 2018).
  4. COSO, Enterprise Risk Management – Integrating with Strategy and Performance (2017).
  5. Beasley, M. S., Clune, R. and Hermanson, D. R. (2005). Enterprise risk management: An empirical analysis of factors associated with the extent of implementation. Journal of Accounting and Public Policy, 24(6), 521–531. Journal page.
  6. Hoyt, R. E. and Liebenberg, A. P. (2011). The value of enterprise risk management. Journal of Risk and Insurance, 78(4), 795–822. doi:10.1111/j.1539-6975.2011.01413.x.
  7. Power, M. (2009). The risk management of nothing. Accounting, Organizations and Society, 34(6–7), 849–855. Journal page.

Last reviewed: 9 October 2026 · Next review due: October 2027

Spotted an error or an out-of-date requirement? Suggest a correction (free GitHub account needed). See how we check content.