Test a key control
How to test whether a key control is designed well and operating consistently: plan the test, walk through the control, test a sample or the whole population, evaluate every exception and report.
Use this when
- A key control is due for testing under your assurance plan
- An incident suggests a control may have failed
- A control has changed, or a new control has gone live
You'll need
- The control description: who, what, when, how, evidence and exceptions
- The population of occurrences for the test period
- A testing workpaper (template below)
Who's involved
- The tester (first-line self-testing, second-line review or internal audit)
- The control owner
- Whoever agrees and tracks the resulting actions
The steps
-
1 Plan the test
- Pick controls based on risk, key controls first.
- Define the test objective, the period covered and the population.
Output: A test plan. Read more: Control design and testing
-
2 Check the design
- Ask whether the control could work if performed perfectly: does it address a specific cause, cover the whole population, run often enough, with defined thresholds, evidence and exception handling?
- Check any reports or data it relies on are complete and accurate.
Output: A design conclusion.
-
3 Walk through one transaction
- Follow one transaction end to end to confirm how the control really works. Practice often differs from the procedure.
Output: Confirmed understanding of the control.
-
4 Choose the method and sample
- Use inspection, re-performance or data analytics; inquiry alone is never enough.
- Size the sample to how often the control runs and how much reliance is placed on it, using your organisation's methodology.
Output: A sample (or the full population) and a method. Read more: Control testing: sampling
-
5 Test operating effectiveness
- Check evidence that the control operated correctly each time in the sample.
Output: Results for each sample item.
-
6 Evaluate every exception
- For each failure: was it a one-off or systemic? What was the root cause? Did it cause harm, which may make it an incident or breach?
Output: Exceptions explained, and incidents raised where needed. Read more: Respond to an incident
-
7 Rate, report and track actions
- Conclude on effectiveness, agree actions with owners, report to management and track actions to closure.
- Under CPS 230, results are reported to senior management and gaps are fixed in a timely way.
Output: A rated result and tracked actions. Read more: Issue and action management
Templates and tools
Common mistakes
- Relying on inquiry alone.
- Testing operation without checking design first.
- Treating exceptions as one-offs without finding the cause.
- Not checking that system reports used by the control are complete and accurate.
General guidance only. This playbook summarises common good practice and the main requirements explained on this site. Your organisation's own policies, licence conditions and the official sources take priority, and complex matters need professional advice.
Sources
- Australian Prudential Regulation Authority, Prudential Standard CPS 230 Operational Risk Management and CPG 230.
- Committee of Sponsoring Organizations of the Treadway Commission, Internal Control – Integrated Framework.
- The Institute of Internal Auditors, Global Internal Audit Standards.
Last reviewed: 1 October 2026 · Next review due: October 2027
Spotted an error or an out-of-date requirement? Suggest a correction (free GitHub account needed). See how we check content.